NEW Watch Recent Episode
Explore now
Get a Rubber Flooring Quote in Dubai

How We Design & Deliver It

Site Survey & Analysis

Sub-base conditions, equipment layout, and fall heights assessed before a single specification is confirmed.

Design & Specification

EPDM thickness and colour confirmed per zone in writing before a single square metre is ordered.

Supply & Installation

Gebal manages delivery and full installation. Seamless cast in-situ wet pour applied directly to the prepared sub-base.

Safety Compliance

All surfaces installed to EN 1177. Full KHDA and Dubai Municipality compliance documentation provided at handover.

Dubai-Wide Coverage

Free Zones, Jbel Ali, Business Bay, Meiras, Movenpicks, new-build communities across all Dubai districts.

After-Sales Support

Post-installation support for schools, government clients, and residential developments across Dubai.

Built For Performance

Every surface is engineered,
not estimated.

Gebal Group doesn't guess at specifications. We survey, design, certify, and install with full EN 1177 and KHDA documentation at every Dubai handover. Here's what that delivers in the field.

EN 1177

Certified Standard

Impact-Attenuating Surfaces

Every EPDM installation certified to EN 1177 — the international benchmark for critical fall height protection beneath play equipment.

60C+

Surface Resistance

UV & Heat Stable

Aliphatic binder resists colour fade, hardening, and binder breakdown under intense Dubai heat cycles that degrade standard rubber systems.

Zero

Joints or Seams

Cast In-Situ Seamless

Applied directly onto the prepared sub-base. No joints, no edges, no trip hazards — one continuous pour for each zone, shaped to the site.

100%

Documentation

Full Handover Pack

Certification documents, test reports, and compliance records provided at every handover — ready for KHDA, Dubai Municipality, and government audits.

Designed for Dubai's Surface Conditions

Standard rubber fails here.
Ours doesn't.

Dubai's surface conditions destroy low-spec rubber systems within seasons. Every specification Gebal Group makes is built for Dubai's climate, not adapted from European standards written for 20°C summers.

Extreme Heat Resistance

Surface temperatures in Dubai regularly exceed 60°C. Aliphatic polyurethane binders maintain flexibility and adhesion where aromatic binders crack, harden, or delaminate within 12–18 months.

Tested to 70°C surface temperature stability

UV Colour Stability

EPDM granules with aliphatic binder retain colour integrity under year-round Dubai sunlight exposure. No yellowing, chalking, or fading that signals surface degradation.

Aliphatic binder — not aromatic

Coastal & Humidity Resistance

Dubai's coastal environment adds salt air and high humidity to the UV and heat load. Gebal Group's specifications include sub-base drainage detailing to prevent moisture retention and delamination risks.

Specified for coastal Dubai installations

Why Gebal Group

40 years of outdoor infrastructure.
One team. One handover.

We've been designing, supplying, and installing outdoor recreation infrastructure across Dubai and the GCC since 1984. KHDA compliance and EN 1177 certification aren't extras we bolt on at the end — they're built into every project from the first site survey. One team handles everything. One handover. No gaps.

  1. In-House Installation: No Subcontractors

    Our own crews survey, install, and certify every Dubai project. No third-party coordination risk, no liability gaps.

  2. Specification Before Order

    Thickness, colour, and zone layout confirmed in writing before a single square metre of material is ordered. No surprises on site.

  3. Full KHDA & Dubai Municipality Compliance

    EN 1177 test reports, certification records, and handover packs ready for KHDA, Dubai Municipality, and all Dubai authority audits.

  4. Aliphatic Binder as Standard

    Every Dubai EPDM project uses aliphatic polyurethane binder. This is not a premium upgrade — it is the minimum we will install in Dubai's climate.

Common Questions

About EPDM Rubber Flooring in Dubai

EPDM (Ethylene Propylene Diene Monomer) rubber flooring is a cast in-situ wet pour safety surface applied directly onto a prepared sub-base. It is the preferred surfacing for playgrounds, parks, and sports areas in Dubai because aliphatic polyurethane binders withstand surface temperatures exceeding 60°C without cracking, hardening, or colour fade.

Yes. Gebal Group installs KHDA-compliant EPDM safety surfacing for school playgrounds across Dubai. Full certification documentation, test reports, and compliance records are provided at handover, ready for KHDA review and audit.

Gebal Group covers all Dubai districts including Business Bay, Jbel Ali, Al Quos, Al Sufouha, Meiras, Dubai South, Dubai Creek Harbour, and all residential communities and development zones.

Correctly specified EPDM rubber flooring with an aliphatic polyurethane binder, installed to EN 1177, typically lasts 10-15 years in Dubai conditions with standard maintenance.

Yes. EPDM wet pour can be installed on podium decks, rooftop play areas, and elevated communal zones in Dubai residential towers and master-planned developments. Sub-base conditions and drainage are assessed during the site survey.

Yes. Gebal Group provides a complete handover pack for every Dubai project: EN 1177 test reports, certification records, and compliance documentation ready for Dubai Municipality, KHDA, Gems, and all other Dubai authority audits.

Ready to specify EPDM flooring for your Dubai project?

Our team confirms KHDA compliance, thickness, and certification requirements before a single metre is ordered.

Quote My Dubai Rubber Flooring

Get In Contact With Our Team

Fill in your information

    Explore Other Builds

    Khawaneej Park

    Dubai, UAE | 2025

    Sector(s)

    Public Parks Theme Parks & Public Parks

    What We Made

    Playgrounds RF +1

    Mankhool Park

    Dubai, UAE | 2025

    Sector(s)

    Public Parks Theme Parks & Public Parks

    What We Made

    Playgrounds RF

    Bright Minds International School

    Jeddah, KSA | 2026

    Sector(s)

    Schools & Universities

    What We Made

    Playgrounds Rubber & Grass Surfacing +1

    Al Noor International School

    Riyadh, KSA | 2026

    Sector(s)

    Football & Courts Schools & Universities

    What We Made

    Multi-Use Sports Pitches Rubber & Grass Surfacing
    Rubber surfacing and play equipment installation Remraam Dubai

    Remraam Community

    Dubai, UAE | 2026

    Sector(s)

    Residential

    What We Made

    Outdoor Gyms Rubber & Grass Surfacing
    From The Blog

    EPDM, safety surfacing & outdoor spaces.

    In-depth guides and project stories covering rubber surfacing, EN 1177 compliance, KHDA standards, and outdoor recreation across Dubai and the GCC.

    House & Highlight Our Recent PDF'S

    Discover Spaces That Move People

    Walk through what we create—from shaded comfort to courts that spark play. Because we don’t just construct environments. We shape moments of pause, movement, laughter, and belonging—right here in the region we call home.